Logo do repositório
 
A carregar...
Miniatura
Publicação

Hole cleaning performance monitoring during the drilling of directional wells

Utilize este identificador para referenciar este registo.
Nome:Descrição:Tamanho:Formato: 
Ferreira_2012.pdf3.21 MBAdobe PDF Ver/Abrir

Resumo(s)

During drilling operation, cuttings are produced downhole and must be removed to avoid issues which can lead to Non Productive Time (NPT). Most of stuck pipe and then Bottom-Hole Assembly (BHA) lost events are hole cleaned related. There are many parameters which help determine hole cleaning conditions, but a proper selection of the key parameters will facilitate monitoring hole cleaning conditions and interventions. The aim of Hole Cleaning Monitoring is to keep track of borehole conditions including hole cleaning efficiency and wellbore stability issues during drilling operations. Adequate hole cleaning is the one of the main concerns in the underbalanced drilling operations especially for directional and horizontal wells. This dissertation addresses some hole cleaning fundamentals which will act as the basis for recommendation practice during drilling operations. Understand how parameters such as Flowrate, Rotation per Minute (RPM), Rate of Penetration (ROP) and Mud Weight are useful to improve the hole cleaning performance and how Equivalent Circulate Density (ECD), Torque & Drag (T&D) and Cuttings Volumes coming from downhole help to indicate how clean and stable the well is. For case study, hole cleaning performance or cuttings volume removal monitoring, will be based on real-time measurements of the cuttings volume removal from downhole at certain time, taking into account Flowrate, RPM, ROP and Drilling fluid or Mud properties, and then will be plotted and compared to the volume being drilled expected. ECD monitoring will dictate hole stability conditions and T&D and Cuttings Volume coming from downhole monitoring will dictate how clean the well is. T&D Modeling Software provide theoretical calculated T&D trends which will be plotted and compared to the real-time measurements. It will use the measured hookloads to perform a back-calculation of friction factors along the wellbore.

Descrição

Palavras-chave

Hole cleaning Non productive time (NPT); Cuttings Flowrate Rotation per minute (RPM) Rate of penetration (ROP)

Contexto Educativo

Citação

Projetos de investigação

Unidades organizacionais

Fascículo

Editora

Licença CC